What are all the conditions for equipment to be followed? Ⓡ

EQUIPMENT CONDITIONS BEFORE COATING.



Coating materials must be sourced from approved paint manufacturers and suppliers in accordance with customer-approved processes/specifications.

If required by specifications, a performance test of the paint should be carried out in the workplace before starting the painting operation. 

Performance test results must meet customer requirements.

Inspection of paint - visual inspection, color label on each container, color batch certificate, paint should not be used after the specified expiration date.

Store paint materials in a cool, dry place according to the manufacturer's instructions. 

Visually inspect the compressor fittings and compressed air once a day before starting to use the blotting paper. T

The device must be electrically grounded.

The compressed air supply used for blasting and painting must be free of moisture and the exit air temperature must be below 80°C. 

Check with blotting paper and you should not see any traces of oil or water contamination.


Note: This section features several affiliate links, meaning we will earn a small commission if you purchase through these links...

Post a Comment

0 Comments